Inspect the plan. Question the assumptions.

Three practical resources for deciding what an application needs before production: a worked planning example, an evidence checklist and a guide to choosing a delivery path.

Worked planning example

Sample Plan Pack: customer onboarding.

A Plan Pack connects the proposed scope, technical decisions, acceptance criteria and responsibilities. This example shows how those parts fit together; an engagement needs its own approved baseline.

Illustrative example — not client work. This fictional scenario has no delivered system, executed test results, client approval or project outcome. All implementation and acceptance steps below are proposed, not completed.

1. Starting point and decision to make

Imagine an AI-built customer-onboarding prototype. Customers can submit an application and operations can demonstrate an approval, but the CRM update is simulated. The demo proves the journey; it does not yet remove manual data entry or establish who is responsible when a handoff fails.

The delivery goal is an approved application reliably handed to the CRM, with controlled access and a clear operating owner. The assessment must check source access, runtime suitability, identity services and the CRM contract before these become assumptions behind a fixed-price proposal.

2. Scope, exclusions and dependencies

  • Included workflow: Customers submit and view their own applications. Authorized operations reviewers approve assigned applications. An approved application creates one customer record in the agreed CRM, with its handoff status recorded.
  • Included engineering: Integration with the agreed identity service, server-side permissions, one CRM connector, duplicate-safe retry handling, an approval and handoff trail, acceptance tests and a deployment and handover runbook.
  • Excluded: Identity verification or credit decisions, payment processing, additional CRM systems, native mobile apps, historical-data migration and ongoing hosting or support. This example is not a regulatory onboarding assessment.
  • Client dependencies: Identity and CRM sandbox access, confirmed reviewer roles, an approved field mapping and data-handling policy, a product approver and an operations owner. The CRM must support a verified way to prevent duplicate creation using a stable application reference.

Applications contain customer information. Agree collection, access, retention and log-redaction requirements before using real data. Use synthetic records for the assessment and acceptance tests unless other data use has been explicitly approved.

Commercial baseline: After assessment, approve the Plan Pack and commercial terms before the production build. The fixed price covers this scope under the agreed assumptions; additional effort caused by our underestimation stays with us. A second integration or a changed CRM contract requires an explicit change decision. No example price or delivery duration is implied here.

3. Architecture decision ADR-01: harden conditionally

Proposed choice: Retain the interface and supported application runtime. Enforce customer ownership and reviewer permissions on the server. Store application state, the approval record and a durable handoff task together. A server-side worker sends approved data to the CRM using the stable application reference; CRM credentials stay server-side.

Why this option: The demonstrated journey may be reusable. The gap is the reliable, controlled handoff to operations. Retaining the interface avoids an unnecessary rewrite, while a durable handoff record separates the customer interaction from CRM availability. This adds a worker and retry state that the operating team must be able to support.

Alternatives and trigger to reconsider: Re-platform if the current hosting cannot support secure credentials, durable processing or release control. Consider rebuilding the affected workflow if its data model cannot represent ownership and approval states reliably. Verify the CRM's duplicate-prevention behavior before committing to this approach.

Failure behaviour: A CRM timeout must not mark onboarding complete. Leave the handoff pending and visible to operations. Before retrying, resolve any uncertain result through the agreed reference lookup or idempotent operation. Unresolved failures require an alert and an owned exception path, not silent retries or duplicate customer records.

4. Requirement → implementation → test → approval

  1. Requirement R-01: a controlled, reliable customer handoff

    A customer may access only their own application. Only an authorized reviewer may approve an assigned application. Only an approved application may create a CRM customer record, and a repeated delivery attempt must not create a second record.

    Acceptance criterion AC-01: An authorized approval results in one CRM record with the agreed fields. Unauthorized attempts are denied. Repeated processing preserves the same CRM record, and an unconfirmed handoff remains visible as pending or failed.

  2. Planned implementation: permissions and a durable CRM handoff

    Check ownership and reviewer authorization on every relevant API operation. Validate the application state before approval, persist its handoff task and correlate the CRM response with its stable reference. Record who approved the application and the confirmed integration result without logging sensitive fields.

    Record to keep: Link the reviewed implementation revision to R-01 and AC-01. No implementation revision exists in this example.

  3. Proposed tests T-01 to T-05

    • T-01: A customer cannot read another customer's application.
    • T-02: An unauthorized approval is denied and triggers no CRM handoff.
    • T-03: An authorized approval creates one CRM record with the agreed fields.
    • T-04: Reprocessing the same approval does not create a duplicate record.
    • T-05: An uncertain CRM result stays visible and is reconciled before completion.

    Status: not run. Actual evidence would record the revision, environment, synthetic fixtures, expected and observed results, and linked defects.

  4. Approval: technical review and client acceptance

    The architect reviews the implementation and test evidence. The client product owner accepts the workflow against the agreed criteria; the designated release owner confirms operational readiness.

    Status: pending. An unresolved access-control failure, duplicate creation or lost handoff blocks this example's release. A demonstration alone cannot close AC-01.

5. Change handling: a request is not an approval

Suppose the client asks to add email notifications after scope approval. Record change CR-01 separately from the baseline: recipient rules, message content, provider choice, data exposure, retry behaviour and additional tests all need decisions.

The architect assesses the technical impact. The delivery proposal records any change to scope, fee, dependencies and schedule. The client can approve, defer or reject it; implementation follows the recorded decision. CR-01 is unapproved in this example.

By contrast, a duplicate CRM record on retry fails the existing acceptance criterion and is not a new feature. If agreed CRM access proves unavailable, record the broken dependency assumption and agree an alternative before proceeding. Commercial treatment follows the engagement terms; an in-scope defect is not a scope change.

6. Handover checklist

For this example, the release review would check the following items:

  • Approved scope, architecture decisions, changes and remaining limitations.
  • Repository access, a tagged release and repeatable build instructions.
  • R-01 linked to implementation review, test results and the acceptance record.
  • Deployment, rollback and data-recovery procedures with rehearsal evidence.
  • Monitoring for CRM failures, stalled handoffs, access denials and application errors.
  • Secure credential transfer, access review and removal of temporary accounts.
  • Named operational owners, incident escalation and agreed support boundaries.

These are proposed deliverables, not proof that the example is ready to release. A real Plan Pack also needs project-specific data requirements, performance criteria, approvals and commercial terms.

Self-check

Prototype-readiness checklist.

Use this before asking for a delivery estimate or planning a release. For each area, write down the evidence, its owner and what is still unknown. Do not turn unanswered questions into assumed passes.

  1. Users and acceptance

    Which user roles and workflows are included? What must each role be allowed and forbidden to do? Identify a product owner and write an observable acceptance condition for each critical workflow.

    Look for: A scope list, role matrix, exclusions and acceptance criteria, not only screenshots.

  2. Code and deployment ownership

    Can someone other than the original builder reproduce the build from a clean checkout? Can you change the server code, manage secrets and deploy outside a preview account? Check dependency support and licences.

    Look for: Repository access, build instructions, an environment inventory and identified platform constraints.

  3. Data and access controls

    What personal or sensitive information enters the system, where does it go and when is it deleted? Test permissions at the API, including attempts by another user or role. Check logs and test fixtures for unintended disclosure.

    Look for: Data flows, an access policy, denied-access tests and agreed data-handling responsibilities.

  4. Integrations and failure paths

    Which demo integrations are mocked? What happens on timeout, duplicate delivery, expired credentials or rate limiting? Identify who owns each external dependency and which system is the source of truth.

    Look for: API contracts, access prerequisites, reconciliation rules and tested failure behaviour.

  5. Verification and recovery

    Do tests cover critical workflows and denied actions on the version you intend to release? Can you restore data and reverse a deployment? Agree workload assumptions before interpreting a performance result.

    Look for: Revision-specific test results, open defects and deployment, rollback and restore rehearsal records.

  6. Operation and release authority

    Who monitors the system and responds to incidents? Who approves release, accepts remaining risks and maintains dependencies? Distinguish a defect warranty from ongoing operational support.

    Look for: Named owners, alert destinations, operating notes, acceptance records and support terms.

Turn the answers into decisions

Mark each area evidence available, needs verification or unknown. Give each gap an owner and next action. Missing source access, an unresolved permission flaw or no recovery owner can justify pausing a release, even if most other items look satisfactory.

This is a discussion aid, not a score or certification. A repository review cannot prove live access configuration, recovery capability or regulatory compliance. The Readiness Assessment scopes application-specific investigation and records what could and could not be verified.

Choosing a delivery path

Harden, re-platform or rebuild?

Choose based on the constraint that prevents safe operation, not whether the application was AI-generated or which stack is fashionable. Preserve useful behaviour where the evidence supports it.

Harden: keep the application, close specific gaps

This fits when the architecture supports the required workflow, the runtime is maintainable and the code can be changed and tested. Typical work includes server-side permissions, validation, integration failure handling, monitoring and recovery procedures.

Tradeoff: You retain working behaviour and avoid an unnecessary migration, but also retain the current design's constraints. Adding tests may reveal coupled code that makes apparently small changes expensive. Hardening is not a promise that all underlying design problems can be patched.

Re-platform: change the operating foundation

Consider this when application behaviour is useful but the hosting, database or runtime blocks required access controls, deployment ownership, observability or integration support. Keep compatible application logic while moving the constrained part.

Tradeoff: You may gain operational control while introducing migration work, configuration differences and a period of running both environments. Data reconciliation, cutover and rollback need explicit tests. Moving platforms does not repair flawed permissions or business rules by itself.

Rebuild: replace a structure that cannot support the requirement

Consider rebuilding a bounded component when the data model cannot represent required ownership, critical source is unavailable or an unsupported design prevents maintainable change. Capture the behaviour worth preserving before replacing code.

Tradeoff: A new design can address a structural problem, but risks losing undocumented behaviour and reintroducing solved defects. It still needs migration, acceptance tests and a transition plan. A rewrite is not automatically cheaper, faster or safer.

Apply the options to the customer-onboarding example

If the existing application can enforce permissions and support a reliable CRM handoff, test a hardening approach on one approval journey. If the platform cannot protect credentials or support durable processing, investigate re-platforming. If ownership and approval states cannot be represented reliably, compare a bounded workflow rebuild with changing the current data model.

The options can be combined: retain the interface, replace an authorization component and migrate the deployment. Label each part so that a proposal explains what is kept, what changes and what must be retested.

Record the decision before pricing the build

  • The observed constraint and evidence, separated from assumptions.
  • The options considered and why each was retained or rejected.
  • A bounded technical investigation for any unresolved critical assumption.
  • Migration, coexistence, acceptance and rollback requirements.
  • The dependencies and open questions that could change scope or price.
  • The decision owner and conditions that would trigger a review.

Sometimes the right result is further investigation or a no-go. A confident recommendation needs application evidence; this guide cannot establish a delivery estimate or select a path for an unseen system.

Apply these questions to your application.

Bring your starting point and the gaps you have identified. We can discuss whether discovery, assessment or advisory is the appropriate next step.