Delivery assurance

Make the delivery inspectable.

A useful assurance discussion connects a control to an owner, a check and a record. Start with the engineering and data-handling requirements of your application, then agree what your reviewers need to see.

Engineering controls

Define the check and the decision it supports.

Use these expectations when scoping a delivery. The agreed plan should identify which controls apply, who performs them and which evidence is included in handover.

  1. Scope and architecture review

    Record requirements, data flows, alternatives, assumptions and acceptance criteria. The architect owns the technical recommendation; the client decision-maker approves scope and commercial changes.

    Evidence: A versioned plan, architecture decisions, open questions and the baseline approval.

  2. Implementation review and testing

    Review code, including AI-assisted changes, against the approved requirements. Define relevant access-control, integration, dependency and functional checks. Record what was tested and what was outside the test scope.

    Evidence: Reviewed changes linked to requirements, test results for a specific revision and environment, and unresolved findings.

  3. Release and exception decisions

    Agree release-blocking criteria before release. A failed blocking check requires correction or an explicit decision by an authorized owner where an exception is permitted. Record the risk, mitigation and follow-up; do not silently relabel a failure as a pass.

    Evidence: Acceptance results, exception records, deployment and rollback instructions, and the release decision.

  4. Operational handover

    Identify who owns hosting, access, monitoring, incident response and future changes. Confirm the support arrangement and known limitations rather than treating deployment as the end of responsibility.

    Evidence: A handover checklist, operating notes, ownership contacts and the agreed support or warranty boundaries.

Code, tools and data

Agree access before sharing it.

A development tool is another place where project information may be processed. Its use needs a decision, not an assumption.

Describe the data involved and the access required during discovery. Do not send production credentials, customer records or sensitive source material through an initial enquiry.

  • Identify approved repositories, environments and tools, including whether AI services may receive source code or project data.
  • Define least-privilege access, credential handling and who can grant, review and revoke permissions.
  • Agree test-data sources, separation from production and what may appear in logs, prompts and delivery evidence.
  • Confirm relevant processing terms, subprocessors, location and retention requirements before permitting data access.
  • Assign responsibility for incident reporting, data return or deletion and access removal at the end of the engagement.

Material you can inspect

Start with a worked example.

The sample Plan Pack shows a customer-onboarding workflow, an architecture decision, requirement-to-test traceability, change handling and a handover checklist. It is visibly labeled as an illustrative example, not client work or a completed production assessment.

Use the readiness checklist to identify evidence you already have and gaps to investigate. For engagement evidence, ask for the applicable scope, author or owner, version or review date, findings and limitations. A template alone does not demonstrate that a control has operated.

Regulated engagements

Engineering evidence is not a compliance verdict.

Where additional review is needed, agree the control mapping, data-flow documentation, supplier information and approval records with your technology, security and risk reviewers. Their requirements affect scope and may require specialist or independent work.

DORA is a regulatory framework; SOC 2 is an independent attestation reporting framework. Neither is established by a delivery checklist or an audit trail. This page does not assert an independently verified control status, a certification or an attestation held by Themorix.

You retain your legal, regulatory and operational obligations. Legal advice, penetration testing, certification and independent assurance are not implied by a software delivery engagement; any required specialist work must be separately agreed.

Tell us what your reviewers need.

Bring the workload, data constraints and required evidence. We can discuss the delivery scope and where specialist review is needed.